-
Eduardo Schicker authored
I turned this into a scenario outline instead. It's a way better way of tetsing multiple cases that need the DB cleared inbetween runs. Clearning the DB just made sure that the notification message was appearing for each separate quota change. Change-Id: Ib2e130161033aab39dfefd48a9ad1448a8254219 Signed-off-by: Jinelle Foley-Barnes <jinelleb@catalyst.net.nz>
ddf58211